30-Day Free Trial on Eligible Hosting Plans

Contact Info

106 Anne Rd, Knoxfield VIC 3180, Australia

+61 (03) 82023009

info@ninjaweb.com.au

Contact us
Recommended Services
Supported Scripts
WordPress
Joomla
Drupal
Magento
JavaScript
Angular
React
Node.js

MOVE TO A NINJAWEB VPS

A planned VPS migration for Carlton businesses

Migration assistance is scoped separately around your software, data and access requirements. Talk to NinjaWeb before booking a maintenance window.

NinjaWeb mascot fitting a server into a rack

A clear path from your current host.

A rehearsal gives you the opportunity to check the new environment while the original service remains available. The final move then follows a tested sequence.

01. Review what needs to move

Inventory websites, databases, uploads, mail and scheduled jobs before choosing the destination. If you want NinjaWeb to handle the move, ask for a separate quote based on your current setup and required access.

02. Test on the new VPS

Rehearse on the destination VPS. Verify logins, forms, database writes, uploaded files and any integrations your customers rely on before you switch traffic.

03. Switch when the checks are complete

Agree a change window and a time for the last sync. If the system takes orders, bookings or uploads, decide when writes need to pause so new data is preserved.

VPS MIGRATION IN Carlton

A new home for your existing website.

Keep your Carlton business website available while a trial copy is checked on the new VPS. Logins, forms, transactions and scheduled jobs can be tested before the final transfer, with the original environment retained for an agreed recovery period.

Keep the migration focused.

Moving a working application is easier to verify when unrelated changes are kept separate. A new runtime or redesign can be scheduled after the transferred service is stable.

Preserve the behaviour you rely on

Compatible software versions and matched configuration help the application behave as expected on its new server. Necessary differences should be tested before the move is accepted.

Improve the stack as a separate step

Runtime upgrades, cleanup and architecture changes deserve their own checks. Separating them from the transfer makes any unexpected behaviour easier to trace.

Keep a recovery option during the switch.

A migration plan should cover what happens if an essential check fails. The return path depends on both the original environment and any data written after the move.

  1. Agree the acceptance checks

    Working logins, transactions, integrations and scheduled tasks provide concrete evidence that the move succeeded. A defined decision point keeps the maintenance window manageable.

  2. Account for new data

    Orders, uploads and other changes made after the switch must be considered if traffic returns to the source. Changing DNS alone does not move that new data back.

  3. Retain usable backups

    Readable backups and access to the original environment support recovery. The retention period should be agreed before the old service is cancelled.

SERVER LOCATIONS

Choose where your VPS runs.

Compare the available locations below. Confirm your preferred location and deployment requirements with NinjaWeb before provisioning.

AustraliaSELECTED LOCATIONAustralia

Compare server locations and traffic terms. Confirm your preferred deployment location before provisioning.

VPS PLANS

Find the resources for your next step.

Compare monthly VPS plans in AUD. Australia and Singapore include a monthly traffic allowance; the other listed locations offer unmetered traffic.

NW-VPS1

$20.00 AUD / month

  • 1 vCPU
  • 2 GB RAM
  • 25 GB SSD
  • 1 TB monthly traffic
  • 1 IPv4 address

NW-VPS2

$40.00 AUD / month

  • 2 vCPU
  • 4 GB RAM
  • 50 GB SSD
  • 2 TB monthly traffic
  • 1 IPv4 address

NW-VPS4

$70.00 AUD / month

  • 4 vCPU
  • 8 GB RAM
  • 50 GB SSD
  • 4 TB monthly traffic
  • 1 IPv4 address

NW-VPS5

$90.00 AUD / month

  • 4 vCPU
  • 8 GB RAM
  • 100 GB SSD
  • 5 TB monthly traffic
  • 1 IPv4 address

NW-VPS6

$125.00 AUD / month

  • 4 vCPU
  • 8 GB RAM
  • 200 GB SSD
  • 5 TB monthly traffic
  • 1 IPv4 address

NW-VPS7

$155.00 AUD / month

  • 4 vCPU
  • 15 GB RAM
  • 200 GB SSD
  • 8 TB monthly traffic
  • 1 IPv4 address

Need a different setup?

Let’s discuss it

  • Describe your application
  • Outline resource requirements
  • List migration dependencies
  • Confirm management scope

Finish with a server you can operate.

Once the transferred service has passed its checks, a clear handover keeps administration and any remaining work organised.

Know what changed

Updated endpoints, DNS ownership, certificate renewal and backup arrangements belong in the handover. The person maintaining the service needs access to the relevant records and accounts.

Retire the previous host carefully

Keep the previous host available until the new VPS passes the agreed checks and the recovery period ends. Confirm that jobs, mail and integrations have moved, and retain any backups and records you need before cancelling.

TALK ABOUT YOUR MOVE

Ready to move to NinjaWeb?

Tell us what you host today and when you would like to move. We can discuss the destination VPS, the migration scope and the work needed before scheduling the transfer.